Comprehensive Renovation and Interior Reorganization
The renovation included conservation work, interior redistribution, and upgrading of technical installations, creating open spaces designed to house mini-warehouses and storage units of varying sizes. The new layout optimizes the center’s operational efficiency and ensures compliance with maximum evacuation distances and current safety and accessibility regulations.
The program incorporates storage units adapted to different storage needs, as well as a commercial area for access control and the sale of auxiliary products related to self-storage, such as boxes, locks, shelving, and packing materials.
The project also included the review and renovation of existing installations, including the drainage system, plumbing, fire protection, waterproofing, and the building’s overall structure.